• Kahramanmaraş merkezde, küçük sanayi sitesi genişleme alanında çeşitli sektörlere ait 356 işyeri yapım işidir

Project Details
  • Location:Kahramanmaraş
  • Principal:Kahramanmaraş Küçük Sanayi Sitesi Yapı Kooperatifi
  • Construction area:277.635 m2
  • Work completion:2024

• The Besmayah Treatment Plant Project, which is being constructed to meet the cooling water requirement of the Besmayah Power Plant, an investment of MASS Holding, one of the biggest energy groups in Iraq, will treat the water taken from the Tigris river at the quality to be used in the power plant.
• It has a capacity of 6,000 m3 / hour and will reduce the total amount of suspended matter from the level of 2,000 mg / l of the Tigris river to less than 10 mg / l in the outlet water.

Project Details
  • Location:Bağdat / IRAK
  • Principal:MASS Holding
  • Construction area:
  • Work completion:2021